Luohu builds smart vertical parking garages in Shuibei to ease congestion

To address the long-standing parking shortage in the Shuibei area, Luohu has recently completed the second phase of its smart vertical parking project in the Shuibei Wanshan Park, bringing the total number of new mechanical parking spaces in the area to 200 and providing residents with a more intelligent parking experience.
The second-phase facility, the No. 2 vertical garage, opened this year and introduces several upgrades. Its modular design allows flexible adjustment of parking space dimensions to accommodate a wider range of vehicles, including SUVs.
With the lift structure separated from the parking system and supported by an intelligent robotic mover that automatically aligns vehicles, the garage shortens the parking and retrieval time to under 75 seconds, significantly improving continuous operation efficiency.
The first phase, the No. 1 vertical garage, was completed and put into use in December 2019. Using a vertical-lift system, it provides 100 parking spaces on a footprint of just 125.31 square meters with two standard tower units.
The average parking and retrieval time is about 90 seconds. The facility not only eased parking pressure in the Wanshan Jewelry Industrial Park but also won the title of "Top 10 Most Beautiful Vertical Parking Garages in China" in 2022.










粤公网安备 44030302000492号